Hornsea Onshore Substation

A new onshore substation facility will transform the power produced by Hornsea Project Two wind farm, before connecting to the National Grid.

The 1.4-gigawatt (GW) project in Killingholme will comprise of 165 Siemens Gamesa turbines, expected to be fully operational in 2022.

Billington Structures provided the steel infrastructure for Balfour Beatty on both phase I and II.