Luton Sixth Form College
Date: 01/07/2008
Location: Shires
Project value: £2,240,000.00
The new campus for Luton Sixth Form College consists of a central hub with four attached 2/3 storey classroom wings, plus separate sports hall and refectory. The new facilities will provide 16,800m2, with places for 2,300 students.
Billington Structures are fabricating and erecting the structural steel work, installing metal decking and providing edge protection.
Project Scope
Steel frame, decking and edge protection
Client: Luton Sixth Form College
Main contractor: Norwest Holst
Engineer: Mott MacDonald
Weight of steel: 824 tonnes
Market sector: Education
Design type: Traditional
Frame type: Low rise