Integrated Waste Management Facility, West Sleekburn
Date: 01/08/2007
Location: Central Midlands
Project value: £590,000.00
Integrated Waste Management Facility, West Sleekburn which included a 41m Span portal x 132m long Re-cycling facility. 42m Span portal x 78m long Transfer Building.
Project Scope
Design, Manufacture Supply and Erection of Structural Steelwork
Client: ENL, Integrated Waste Management
Main contractor: Edmund Nuttall Ltd
Engineer: Atkins (Newcastle Upon Tyne)
Architect: Waterman BBT (Leeds)
Weight of steel: 430 tonnes
Market sector: Industrial
Design type: Design & Build
Frame type: Low rise