Billington Structures | Experts in structural steel

Integrated Waste Management Facility, West Sleekburn

Date: 01/08/2007

Location: Central Midlands

Project value: £590,000.00

Integrated Waste Management Facility, West Sleekburn which included a 41m Span portal x 132m long Re-cycling facility. 42m Span portal x 78m long Transfer Building.

Project Scope

Design, Manufacture Supply and Erection of Structural Steelwork

Client: ENL, Integrated Waste Management
Main contractor: Edmund Nuttall Ltd
Engineer: Atkins (Newcastle Upon Tyne)
Architect: Waterman BBT (Leeds)
Weight of steel: 430 tonnes
Market sector: Industrial
Design type: Design & Build
Frame type: Low rise

Gallery

Click an image to enlarge: