Billington Structures Projects

01/12/2008 | The Ridge - Sheffield Student Village

This two-storey steel braced frame structure is part of the redevelopment of The University of Sheffield's student accommodation. The building, which will feature a green roof, will be the amenetie... [read more]

01/11/2008 | North Liverpool Academy

The new campus for North Liverpool Academy will house laboratories, workshops, recording studios, a theatre and teaching rooms equipped with the latest information and communication technology. Th... [read more]

01/10/2008 | Pembury Hospital

Billington Structures fabricated and erected the steelwork for the portal frame plant rooms and the roof steel on the concrete buildings. The Billington build programme also included decking, fire... [read more]

01/10/2008 | Skipton Building Society, Homeloan Management Limited, Skipton

This project involves the construction of two buildings, plus a link block to create the new head quarters for the Homeloan Management Limited arm of Skipton Building Society. Building 1 is three ... [read more]

01/09/2008 | Q14, Quorum Business Park, Newcastle

Quorum is a new business park development providing over 90,000m2 of high quality office accommodation, a 120 bed hotel and retail space. Q14 is a three-storey braced frame structure providing 3,7... [read more]

01/07/2008 | Blum UK Storage Extension, Milton Keynes

Billington Structures fabricated and erected the steelwork for a portal frame structure measuring 24m by 84m, with 20m clear height. The front elevation of the building had a striking angular appe... [read more]

01/07/2008 | Quorum Business Park Car Park, Newcastle

The Quorum Business Park is a new business park development providing over 90,000m2 of high quality office accommodation, a 120 bed hotel and retail space. Billington Structures fabricated and er... [read more]

01/07/2008 | Luton Sixth Form College

The new campus for Luton Sixth Form College consists of a central hub with four attached 2/3 storey classroom wings, plus separate sports hall and refectory. The new facilities will provide 16,800m... [read more]

01/05/2008 | Milton Keynes Academy

This novel design has four spurs radiating from a central oval atrium. The academy consists of a variety of teaching spaces: one-to-one areas, small seminar rooms, larger class rooms. and assembly ... [read more]

01/05/2008 | The Pinnacle MK, Milton Keynes

The Pinnacle MK is located in Milton Keynes’ Central Business District, is the city’s largest office development for over 25 years. It is also the tallest office building constructed in... [read more]

01/04/2008 | St Peter's Square, Stockport

The new six storey office development in St Peter's Square in Stockport is the town's first building to achieve the BREEAM Excellent rating. the building provides nearly 51,000 sqft of grade 'A' of... [read more]

01/03/2008 | Reading Central One, Reading

Reading Central One is the first building in a programme of regeneration in the centre of Reading. The 10-storey structure will provide 219,000 sqft of office space. Billington Structures is fabric... [read more]

01/03/2008 | Reading Central One, Reading

Reading Central One is the first building in a programme of regeneration in the centre of Reading. The 10-storey structure will provide 219,000 sqft of office space. Billington Structures is fabric... [read more]

01/10/2007 | One Southampton Row

Major City Development in London which comprises of a 6 Storey structure with retained fascade, stairs , decking and structural inclusions [read more]

17/08/2007 | No4 St Pauls Square

Shepherd Construction has handed over the final phase of development at St Paul’s Square in Liverpool, delivering Merseyside’s first speculatively built BREEAM ‘Excellent’ b... [read more]

01/08/2007 | Jackson Square Phase 2

5 Storey Residential Development, second phase of a two phase development, Billington also completed phase one. [read more]

01/08/2007 | Integrated Waste Management Facility, West Sleekburn

Integrated Waste Management Facility, West Sleekburn which included a 41m Span portal x 132m long Re-cycling facility. 42m Span portal x 78m long Transfer Building. [read more]

01/07/2007 | Warren Way Recycling Facility

Recycling facilty for Mansfield consisting of a 45m clearspan portal frame (curved roof) to house recycling and waste to energy plants [read more]

01/07/2007 | Rackspace Development

Beam and column structure to provide Mezz deck over footprint of existing building [read more]

01/07/2007 | 52 Park Street, Camberley

Roof steelwork to 9 residential blocks, two 3 storey retail blocks and cineplex 2050 tonnes of complex structural steelwork [read more]

01/06/2007 | Relocation of the Wakefield Market Hall

Relocation of the Wakefield Market Hall using a structural frame with columns off vertical to give an architectural slant to the buildings. [read more]

01/06/2007 | SITA - Extension to existing waste facility

Extension to existing waste facility for SITA uk. [read more]

01/06/2007 | Plot 9, Fox Cover Industrial Park, East Durham

Plot 9, Fox Cover Industrial Park, East Durham Enteprise Zone which included Twin span portal frame, 34m frame x 160 m long, 12m to haunch, 7m bays [read more]

01/06/2007 | Rockingham Park, Princewood Road

Four beam and column units to provide a retail park in Corby Northants [read more]

01/05/2007 | GSK Project Phoenix

Discovery, Research & Automation Facility (DRAF) in Hertfordshire. 3 storey beam and column type buildings, 2 of which have walk-on ceilings [read more]

01/05/2007 | Driffield Leisure Centre

Beam & column with some trusses, Precast floors and stairs added and different paint systems. [read more]

01/05/2007 | Newhall Green High School, Manchester

Part of the Manchester BSF Schools framework, Newhall Green High School consisted of 2 Storey beam & column which included cellform roof beams [read more]

01/04/2007 | White Rose Office Park Extension

5 Sorey Multi Storey Car park in leeds for White Rose Office Campus, Arlington Business Park, Millshaw, Beeston , Leeds [read more]

01/04/2007 | Ashton Market Renewal

Architectural framework for the new Ashton Market Development at Ashton under Lyme [read more]

01/04/2007 | Blakesley Hall Primary School

2 storey primary school, to include steel, metal decking, netting, pre-cast concrete stairs and edge protection [read more]

01/04/2007 | The Mint, Sweet Street, Holbeck, Leeds

Multi Storey Beam and Column structure with associated precast stairs , metal decking, netting and edge protection for an exclusive Office and Retail Development on the main arterial roadway into L... [read more]

01/04/2007 | 22 to 26 The Headrow Leeds

The Headrow Leeds, a complex refurbishment which included a two storey extension to the roof of existing buildings and some complex and at times intensive internal structural remediation and refurb... [read more]

01/03/2007 | PAYD HMS Collinwood Fareham

Beam and column structure to provide the framework for the H M S Collingwood, Pay As You Dine Restaurant. Also included a curved ceullular roof structure. [read more]

01/03/2007 | Lattitude Office Development - Leeds

8 Storey Beam and Column Office Development with Concrete Encased Lower Columns, Metal Deck and Precast Stairs [read more]

01/03/2007 | Esporta Health and Fitness Gloucester

Esporta Health and Fitness Goucester, comprisind of Beam and olumn construction with architectural curved cellforms [read more]

01/03/2007 | New Classroom Building at Bradford College

New Beam and Column Classroom Buildings at Bradford College [read more]

01/03/2007 | Digital Laboratory University of Warwick

4 Storey Building, Mono Pitch Roof including Roof Lights, Cantilevered Fabricated Tee Soffit Beams, Concrete Decking including to Roof, Stainless Steel Solid Bar Bracing [read more]

01/03/2007 | Digital Campus Buildings - Sheffield

Mutli storey speculative office development for Scarborough Developments, includes basement car parking, 16.5m cear spam cellform beams, feature canopies and cantilevers - composite design with ste... [read more]

01/02/2007 | New Galley & Dining Room, H M S Raleigh, Torpoint, Cornwall

New Galley & Dining Room facilities at H M S Raleigh, Torpoint, Cornwall, which included a 1200 m2 ground floor, 2500 m2 roof, enveloped by a 2 storey beam and column braced frame [read more]

01/01/2007 | Cuzzons KV2 Building

Eric Wright have recently contracted Billington to provide trusses in excess of 60 metres span with a building length of 120 metres for the new Cussons distribution building at Agecroft, Manchester... [read more]

01/01/2007 | The Woodlands Residential Development, Linford Wood Milton Keynes

The Woodlands Residential Development Four rectangular 4 storey residential blocks with cellular beams to provide the framework for this hi specification residential development [read more]

01/01/2007 | 1 Finsbury Circus

Alterations inside an existing listed building, including new exposed RHS Atrium and infills to cores. [read more]

01/04/2005 | Ikea Doncaster, Phase 2

When Billington erected the steel structure for the Ikea project in Peterborough, it was the size of twenty football pitches (85,660 square metres) rumored to be visible from space and the UK's thi... [read more]

01/04/2004 | Doncaster International Airport

A new Passenger Terminal Building for Doncaster’s new airport. [read more]

Links in this section