skip to main content

British Museum

Billington Structures manufactured and installed a steel superstructure with a footprint of approximatley 1 500m² consisting of 4 pavilions - each 20 meters in height arranged over 4 floors with an exposed steel frame.

British Constructional Steelwork Association
Sustainability in Steel Construction
Constructionline
Factory Production Control and CE Marking
Building Confidence Accredited
Quality Management System Certification
Environmental Management System Certification
Occupational Health & Safety Management System Certification