skip to main content

125 Deansgate

125 Deansgate development is a £70M 12-storey scheme comprising 10,500m² of Grade A office space and 1,100m² of flexible retail space.

Aiming to achieve a BREEAM ‘Excellent’ rating, this project has a composite design incorporating steelwork supporting metal decking and a 150mm-deep concrete topping. The cellular beams were mainly designed and fabricated by Billington Structures.

The project is due to be completed by mid-2019.

Read more on New Steel Construction here - http://www.newsteelconstruction.com/wp/high-rise-and-column-free/

British Constructional Steelwork Association
Sustainability in Steel Construction
Constructionline
Factory Production Control and CE Marking
Building Confidence Accredited
Quality Management System Certification
Environmental Management System Certification
Occupational Health & Safety Management System Certification